
Yesterday, I shared my new plan for our future new kitchen. It’s a fairly drastic change of plans, however the extra I give it some thought, the extra excited I get about it. In the event you missed that, you can read about it here. The brand new plan appears a lot extra manageable than the earlier bigger, grander plan.
However top-of-the-line issues about this new plan is that it means I’ll maintain the studio half toilet. With the earlier plan, this room had been slated for demolition sooner or later. When that call was made, I closed the door on this room (actually) and by no means seemed again. The door on this room has been closed and the room forgotten for properly over a 12 months now. In truth, I simply seemed again on the weblog, and I can’t see the place I’ve posted something in regards to the toilet after November 2023. That’s pushing two years.
I do know a few of you is likely to be questioning why I’d shut the door and never look again on a half toilet. In any case, even a half toilet that isn’t totally embellished and completed will be helpful, proper? Nicely, no. This toilet requires a pump for the bathroom and sink, and that pump stopped working way back. And since this toilet was on the chopping block, and I had deliberate to show it right into a walk-through pantry from the long run new kitchen to the again doorways of the studio that result in the carport, I had no intention of spending the cash required to restore or change the pump. So I closed the door to the room and deliberate to by no means return till I used to be able to get began on the brand new kitchen and walk-through pantry.
So yesterday, for the primary time in at the least 18 months, I made a decision to open the door and see precisely how I had left it. It wasn’t fairly as dangerous as I had remembered it, however it’s not nice, both.

However after some time, I grew uninterested in the partitions. And after I began engaged on my studio in 2023, I made a decision that the toilet wanted a makeover as properly. That’s after I began taking off the wall tile and developing with a brand new plan for the partitions.

And that is so far as I acquired earlier than I made a decision to go a special path with the operate of this room altogether.

However now, the plan is to maintain the operate of the room the identical and end it. And I’ve to say, I’m type of relieved about that. I actually favored having a working, usable toilet on this facet of the home.

The room is a large number, and it’s been forgotten so lengthy that there are cobwebs in right here. However I don’t suppose it could take lengthy in any respect to complete it. The toughest elements — the crown molding, door trim, window trim, wainscoting, and vainness — are all already in place.

So at this level, I’m a really fundamental makeover, not a rework.

Clearly, the primary order of enterprise must be getting this pump fastened or changed. With no working pump, this toilet isn’t useful in any respect.

After which I can end up with the partitions and few ornamental touches. I feel will probably be a relative fast venture as quickly as I get a plan in place.
After I began engaged on the studio, I had a plan to maintain this toilet actually colourful and enjoyable in line with the colours within the studio. I even designed a wallpaper for the partitions.

However with the brand new plan, I don’t suppose I’ll be utilizing this wallpaper anymore. The brand new plan is to make this toilet the official visitor toilet. That can enable me to utterly end the bed room suite, together with turning the hallway toilet right into a much-needed storage room for Matt’s tools. And it’ll enable us to get a brand new sizzling water heater which is able to go in that storage closet as properly. The new water heater is the final remaining fastened merchandise within the sunroom that’s stopping us from tearing down the sunroom.
So with this toilet turning into our official visitor toilet (and the one visitor toilet we’ll have for an extended whereas), I don’t actually need it to be a loopy, psychedelic, seizure-inducing room. So long as we had that hallway toilet accessible for company, I used to be just about the one one that ever used this half toilet. So I may make it as loopy and colourful as I needed to. However now that it’s going to have a bigger “viewers”, I need it to be a extra usually pleasing room that isn’t lined in loopy shade.
Don’t get me improper. There shall be shade. And, in any case, it’s nonetheless situated inside my studio, which is a colourful feast for the eyes. Lest you neglect…

So company should stroll by this to get to the toilet. However I’m okay with that. This room, greater than every other in our home, is my color-loving persona in room kind.

And everybody who has seen my studio in individual has been very complimentary about it. Even when they wouldn’t need it in their very own properties, folks appear to take pleasure in it in our home.

And I’m happy to report that to this point, my studio hasn’t induced a seizure in a single single visitor. In order that’s good. I feel folks can deal with strolling by my studio to get to a rest room.

However I want to give you a calmer and extra usually pleasing plan for the toilet. I may even carry the inexperienced from the again entry partitions onto the highest parts of the toilet partitions.

Inexperienced is a usually pleasing shade. It might give me shade, and clearly, it’s a shade I like since I selected it for the partitions of the again entry. I already know that it really works properly with the studio. And it could be comparatively fast and simple to do some drywall restore, paint the partitions, add some ornamental touches, and be completed with it.
So proper now, the plan of motion is that this. I’m going to complete up the lobby and bed room. These areas are precedence #1 proper now. (I’m nonetheless engaged on the partitions within the lobby.) As quickly as these two areas are completed, I’m going to complete this studio half toilet. When it’s completed, I’m going to return and switch the hallway toilet right into a storage closet in order that I can get our bed room suite utterly completed with no initiatives left undone. After which, as soon as the bed room suite is 100% completed, I’ll begin on my workshop.
It’s a slight change of plan from earlier than, however not too huge. And this manner, we’ll have a totally completed bed room suite with no awkward “center stage” of getting a visitor toilet inside our master suite suite. I’m very excited in regards to the concept of it being utterly completed with no awkward in between phases, and no initiatives left hanging over my head that I’ve to return and deal with in some unspecified time in the future sooner or later.
Trending Merchandise


